"TO BE SUCCESSFUL, BE ABOVE THE AVERAGE EXPECTATIONS"

"TO BE SUCCESSFUL, BE ABOVE THE AVERAGE EXPECTATIONS" "TO BE SUCCESSFUL, BE ABOVE THE AVERAGE EXPECTATIONS" "TO BE SUCCESSFUL, BE ABOVE THE AVERAGE EXPECTATIONS"
  • N.J.R. GROUP HOME PAGE
  • BROKERING & DISPATCHING
  • WAREHOUSING & FORWARDING
  • CORPORATE TRAVELING
  • N.J.R. TRUCKING LLC
  • GENERAL FREIGHT LOGISTICS
  • SPECIALIZED LOGISTICS
  • HEAVY HAUL LOGISTICS
  • SUPERLOAD LOGISTICS
  • CATERPILLAR EXCAVATION
  • MAINTAINER FABRICATION
  • CONCRETE DIVISION
  • PIPE LAYING & RECOVERY
  • GRADING, PAVING & GROUNDS
  • MANITOWOC CRAWLER CRANE
  • LIEBHERR LTM MOBILE CRANE
  • LIEBHERR MK TOWER CRANE
  • ABOUT N.J.R. GROUP
  • TOWING AND RECOVERY
  • More
    • N.J.R. GROUP HOME PAGE
    • BROKERING & DISPATCHING
    • WAREHOUSING & FORWARDING
    • CORPORATE TRAVELING
    • N.J.R. TRUCKING LLC
    • GENERAL FREIGHT LOGISTICS
    • SPECIALIZED LOGISTICS
    • HEAVY HAUL LOGISTICS
    • SUPERLOAD LOGISTICS
    • CATERPILLAR EXCAVATION
    • MAINTAINER FABRICATION
    • CONCRETE DIVISION
    • PIPE LAYING & RECOVERY
    • GRADING, PAVING & GROUNDS
    • MANITOWOC CRAWLER CRANE
    • LIEBHERR LTM MOBILE CRANE
    • LIEBHERR MK TOWER CRANE
    • ABOUT N.J.R. GROUP
    • TOWING AND RECOVERY

"TO BE SUCCESSFUL, BE ABOVE THE AVERAGE EXPECTATIONS"

"TO BE SUCCESSFUL, BE ABOVE THE AVERAGE EXPECTATIONS" "TO BE SUCCESSFUL, BE ABOVE THE AVERAGE EXPECTATIONS" "TO BE SUCCESSFUL, BE ABOVE THE AVERAGE EXPECTATIONS"
  • N.J.R. GROUP HOME PAGE
  • BROKERING & DISPATCHING
  • WAREHOUSING & FORWARDING
  • CORPORATE TRAVELING
  • N.J.R. TRUCKING LLC
  • GENERAL FREIGHT LOGISTICS
  • SPECIALIZED LOGISTICS
  • HEAVY HAUL LOGISTICS
  • SUPERLOAD LOGISTICS
  • CATERPILLAR EXCAVATION
  • MAINTAINER FABRICATION
  • CONCRETE DIVISION
  • PIPE LAYING & RECOVERY
  • GRADING, PAVING & GROUNDS
  • MANITOWOC CRAWLER CRANE
  • LIEBHERR LTM MOBILE CRANE
  • LIEBHERR MK TOWER CRANE
  • ABOUT N.J.R. GROUP
  • TOWING AND RECOVERY
White Chevrolet Silverado 5500 HD service truck with utility compartments and crane.

WELCOME TO N.J.R. GROUP PIPE LAYING & RECOVERY

 

Pipe Laying and Heavy Duty Recovery segment presentation illustration through company vehicles of choice.

GENERAL MOTORS CONTRACT (Section 179 [6,000 lbs. Vehicle])

  • Cadillac Escalade IQ
  • Chevy 6500 Duramax Diesel Crew Cab Chassis with Kelderman  4" to 6"  Air Suspension w/Maintainer Signature 1 Series 11' Steel Welder Body with 85630 Crane
  • GMC Savana 2500 Luxury 9-Passenger Explorer Conversion Van 


TALBERT MANUFACTURING CONTRACT (Section 179 [up to $5,000,00.00 total on vehicles & equipment])

  • Talbert AC-20 Tag Trailer (Pulled by Duramax Diesel Only)
  • Talbert AC-25 Tag Trailer (Pulled by Cummins X15 Diesel Only)


PETERBILT INC. (Section 179 [quad axle dump truck for transporting and hauling material])

  • Peterbilt Trucks
  • John Deere Equipment  


All Equipment in Pipe Laying and in Towing and Recovery is Under Contract with John Deere and Talbert Pull with Durmax, Deere Diesel and Cummins X15 Engines Only


N.J.R. Group Pipe Laying & Towing and Heavy Duty Recovery segment presentation illustration through sub-contractor entrance, to generate growth and expand our dominion in the industry.


Naomi Jeanette Robinson Group was giving a livelihood through Frank Criscola (Crisdel Group). A well-known microentrepreneur out of South Plainfield, NJ.


I was familiarized with Construction in 1998 by Mr. Albano Graco (Portuguese Grade Phenom). A legend in grading, concrete, pipe laying and demolition.


I was enlightened about being a Grade Foremen by Mr. Ray Walhour and Mr. Guy Centennial to be a professional Grade Foremen in 1996.


Mr. James Robinson (Father) and Mr. Calvin Robinson (Cousin) has indoctrinated me on operating heavy equipment for grading and paving through Local 825 Operating Engineer (I.U.O.E.)


Mr. Joe Logan (Business Agent / Local 825), adopted me through the union to teach me about the duties of a Lead Engineer on a job site and how to work with fellow brothers’ and sisters’ in the union.


Naomi Jeanette Robinson Group mission is to evacuate doubt with achievable. Our goal is to be moderate in this industry. To survey my dreams and ambitiousness and excavate into authenticity.


As we grow into the industry our management and vision will expand to a new perception.


Naomi Jeanette Robinson Group is a limited liability corporation and is owned solely by Tariq Robinson.


 

Naomi Jeanette Robinson Group is a sole proprietorship company which will be owned and operated by Mr. Tariq Robinson. 


The business has journeying contracts with reliable clients. These major companies, that are affiliate with Naomi Jeanette Robinson Group gaining of prosperity are located throughout 

  • North Carolina
  • South Carolina
  • Georgia
  • Virginia
  • Tennessee
  • Maryland 
  • Delaware
  • Pennsylvania


The bargain agreement accordingly to the delegated states. We will look to make our prevailing remuneration from custom homes builders, such as America's Home Place, Toll Brothers and Mid-Atlantic.


Naomi Jeanette Robinson Group was  introduced into the Pipe Laying industry by Lowe's Pro Service. 


However, our objective is to broaden our horizon in the Pipe Laying industry.


 

NAOMI JEANETTE ROBINSON LOGISTICS GROUP        

1444 Jeffreys Road

Rocky Mount, NC 27804

Toll Free Phone# (844)415-3410

Office# (252)877-2108

Cell# (252)903-3751

Fax# (252)877-2117

Toll Free# (844)415-3410

njrtruckingllc@gmail.com 

https://www.njrtruckingllc.com 


CONSTRUCTION, TOWING & RECOVERY AND DISPATCHING OFFICE BUSINESS ADDRESS

  • Street - U.S. Highway-17 @ N.C. Highway-32
  • City, State & Zip Code - Edenton, NC 27932 
  • Facility Size - 
    • Construction Shop - 10,000 Sq. Feet
    • Towing Repair Shop - 10,000 Sq. Feet
    • Dispatching & Estimation Office - 10,000 Sq. Feet
  • Lot Size - 52.93 Acres
    • Construction Lot - 25 Acres
    • Towing Lot - 25 Acres
    • Dispatching & Estimation Lot - 12.93 Acres


Nearest Highways (Within 20 Miles)- 

  • U.S. Route -17
  • U.S. Route - 64
  • U.S. Route - 13
  • N.C. Route - 45


Nearest Interstates (Within 68 Miles)- 

  • Interstate-95
  • Interstate-64
  • Interstate-664

Get Towing Estimate

Building Dreams with NJR Group Pipe Laying Construction Company

The Robinson's Estate Sub-Division  

3047 Bass Landing Road

Edenton, NC 27932

30.41 Acres 

Property Length - 1,080'

Property Width - 1,120'

Cell# (252)903-3751

Fax# (252)877-2117

Toll Free# (844)415-3410

njrtruckingllc@gmail.com 

https://www.njrtruckingllc.com 


PLUMBING JOB FOR AMERICA'S HOME PLACE CLIENT THAT WANTS ALL CONNECTION TO THE HOUSE SUBMERGE IN A STILTS HOUSE 


We are in the developing stage with the homeowener and builder. The request A clean plumbing to a House on Stilts and a Elevator to the house on Stilts. Everything concealed as possible.


We suggest adding a Hollow Concrete Stilt(s) to run electrical wire in one. With concret around the pipe. However, it has to be multiple hollow pipe tubes fo position the line into house


We suggest septic tank on property pending the connection distance to save money. To reduce labor cost and their is a connection fee that has to be paid as well.


This is a job we are still awaiting for the builder to break ground. The excavation division is the mechanical contractor rental  on A Wind Turbine and Generator lines inside a multiple 4"" PVC Schedule 40 Pipe that has to be concealed to Utility Pole Transformation to usable energy sold back to the Electric Company


We are looking to have City Utilites into the new Home. However. The Homeowner wants the best Pluming Service that will be 

  • Less maintainence in extreme cold and extreme heat. 
  • Which version is more frequently inspections and who pays the cost?
  • What Pipes Last Longer and will the chemicals inside water decay the pipes and will that be harmerful over time?
  • How do i put healthy filtration in my well water if i choose that Route?


The homeowner is in talks with builder and Excavation Division for Crane Prep the Property and once that is to a agreed terms and cost we will give the builder a price without breaking the bank. 


Calucating the Cost for City Hook up and Well Water with Septic Services to Come!


Our Work in Progress: A Gallery of NJR Group Pipe Laying Division Inventory Equipment

    PIPE LAYING AT 15' 3" OR LESS SETUP

    15'3" Pipe Laying Digging Depth & Less Excavator Trailer Puller

    15' 3" Pipe Laying Digging Depth & Less Excavators Trailer Hauler

    15' 3" Pipe Laying Digging Depth & Less Excavators Trailer Hauler

    CHEVY SILVERADO 6500 CREW CAB 4x4 w/KELDERMAN 4 to 6 INCHES AIR RIDE SUSPENSION WITH A MAINTAINER WELDING BODY

     GVWR: 23,500 lbs.

    Body Rating: 52,500 ft./lbs.

    Body Weight: 8,288 lbs.

    Body Length: 133″

    Body Height: N/A

    Floor Width: 49″

    Body Width: 96″

    Side Pack Height: 52″

    Side Pack Depth: 23″

    Clear Cab to Axle: 84″

    Applicable Chassis: Chevy Silverado 6500 Crew Cab Chassis 

    Bumper Pintle Hook Height - 

    • 18" Air Bags Deflated
    • 24" Air Bags Inflated


    JOB TRUCK DESCRIPTION

    • Job Length - No Max.
    • Job Width - No Max
    • Job Cuts - 15' or Less
    • Trench Size - 3' Width 


    STRENGTH ON JOBSITE:

    • The Zero Counterweight Ration to Tracks Length or width. 
    • Perfect Machine for 1/2" or higher cuts to loosen soil for leveling in tight Spots 
    • Reduce Manual Labor Insurance Claims and maintain or lower work comp. Increase due to unsafe operations.
    • All Types of Fabrication and installation in centering the pipe in the trench


    15' 3" Pipe Laying Digging Depth & Less Excavators Trailer Hauler

    15' 3" Pipe Laying Digging Depth & Less Excavators Trailer Hauler

    15' 3" Pipe Laying Digging Depth & Less Excavators Trailer Hauler

    TALBERT AC3-20 ART TAG TRAILER

     

    • 40,000 lb. Capacity
    • Apitong Flooring
    • Tires: 215/75R17.5 (H)
    • 27 ft. 0 in. - Length
    • Deck - 21 ft. 0 in. 
    • Flat 6 ft. 0 in. Beavertail
    • Estimated Weight: 9,200 lbs.
    • 38” Wide by 6 ft. 0 in. Long Air Ramps with Wood Flooring
    • 33” Loaded Deck Height


    JOHN DEERE 50P-TIER COMPACT EXCAVATOREXCAVATOR DESCRIPTION

    • Operating Weight - 10.874 lbs.
    • Pipe Laying Digging Depth - 9' 7"or less
    • Pipe Laying Job Size - Residential (Sub-Division) Narrow working areas


    JOHN DEERE 75P-TIER MID-SIZE EXCAVATOR DESCRIPTION

    • Operating Weight - 19,326 lbs.
    • Pipe Laying Digging Depth - 15' 3" or less
    • Pipe Laying Job Size - Residential (Sub-Division) Narrow working areas


    JOHN DEERE 335P COMPACT TRACK LOADER DESCRIPTION

    • Operating Weight - 13,542 lbs.
    • Pipe Laying Trench Width - 24" or less
    • Pipe Laying Job Size - Residential (Sub-Division) Narrow working areas


    WEAKNESS ON JOBSITE:

    • Working Out of a Pit Loading Trucks on a 4 to 1 Pit. The Reach and Weight Capacity Ratio is High and i high center of gravity makes its a hazard.
    • Have to be lifted out of Excavation Pit with our Recovery Department. 
    • Limited to 30,000 lbs, cargo on the jobsite. Deere 75P Excavator is 19,326 lbs. operating weight

    PIPE LAYING AT 25' OR LESS SETUP

    25' Digging Depth & Less Excavator Trailer Puller

    25' Digging Depth & Less Excavators Trailer Hauler

    25' Digging Depth & Less Excavators Trailer Hauler

     

    PETERBILT 589 TRI AXLE w/72" FLAT TOP SLEEPER

    Wheelbase: 306"

     GVWR: 59,500 lbs.

    Chassis Weight: 25,200 lbs.

    Frame Length: 367"

    Engine: Cummins

    Horsepower: 600 hp

    Stacks Height: 12"

    Sleeper: 72" Flat Top Sleeper

    5th Wheel Height - 51"


    JOB TRUCK DESCRIPTION

    • Job Haul Road Radius - Min. 50'
    • Job Haul Road Width - 30'
    • Job Length - No Max.
    • Job Width - No Max
    • Job Cuts - 22' or Less
    • Trench Size - 3' Width 


    STRENGTH ON JOBSITE:

    • Loading Trucks in All Directions
    • The Zero Turn Counterweight Excavators Can Work Side by Side in Excavation Pit to Increase the Production
    • Great for Rigging and Lifting Pre-Cast Concrete with a Zero Turn Counterweight Excavator
    • Allow us to Create Close Stagging Areas on Both Sides of Trench for Deliveries



    25' Digging Depth & Less Excavators Trailer Hauler

    25' Digging Depth & Less Excavators Trailer Hauler

    25' Digging Depth & Less Excavators Trailer Hauler

    TALBERT 60CC/55SA-LD 60-TON LOWBOY TRAILER

     

    • 120,000 lb. Capacity
    • Tires: 215/75R17.5 (H)
    • 65'6" Total Length
    • Gooseneck Length - 12' + 14" Extension
    • Flat Deck Length - 31'
    • Rear Deck Length - 14'
    • Flip Axle Stinger Length - 8' "
    • Estimated Weight: 11,700 lbs.
    • Valspar R-Cure 800 Red or Black Paint
    • 33” Loaded Deck Height


    JOHN DEERE 135p - TIER MID-SIZE EXCAVATOR DESCRIPTION

    • Operating Weight - 33,951 lbs.
    • Pipe Laying Digging Depth - 18' or less
    • Job Size - Residential (Sub-Division) Narrow working areas


    JOHN DEERE 345p - TIER MID-SIZE EXCAVATOR DESCRIPTION

    • Operating Weight - 78,705 lbs.
    • Pipe Laying Digging Depth - 22' or less
    • Job Size - Residential (Sub-Division) Narrow working areas


    JOHN DEERE 710p BACKHOE LOADER DESCRIPTION

    • Operating Weight - 26,786 lbs.
    • Pipe Laying Digging Depth - 19' or less
    • Job Size - Residential (Sub-Division) Narrow working areas


     WEAKNESS ON JOBSITE:

    • Not Good in All Sub-Division 
    • Axle Weight Restriction on Bridges into Jobsites
    • Working Area Need to Be Respected

    Expert Craftsmanship for Your Construction Need

    RECOVERY RESISTANCE WITH NRC INDUSTRIERS


    ROLLING RESISTANCE 

    1. ROLLING HARD: Hard Flat Ground and the load on the wheels on concrete and tires are inflated
    2. ROLLING SOFT: It is on soft surface such as grass or gravel


    GRADIENT RESISTANCE

    15% OF GRADIENT: The force of gravity moving up or down a grade45% OF GRADE: The force of gravity moving up or down a grade


    DAMAGE RESISTANCE

    DAMAGE: Is the force that resist the movement when rolling object is damaged


    30% OF GRADIENT: The force of gravity moving up or down a grade


    ROLLING HARD: Hard Flat Ground and the load on the wheels on concrete and tires are inflated


    ROLLING SOFT: It is on soft surface such as grass or gravel


    MIRE RESISTANCE

    TIRE MIRE: When tire is sunk into the dirt, gravel, mud, sand or other soft surface


    WHEEL MIRE: If it is sunk up to lower part of the wheel Rim


    BODY MIRE: If it is sunk up to the body

    BOOM RECOVERY RESISTANCE WITH NRC INDUSTRIERS

     

    NRC 85-TON ROTATOR BOOM RECOVERY PULLING CAPABILITIES LIMITATIONS

    Stage #1 - 30’ Max. Height  / 0 - 70 Degrees

    THERE ARE 4 TYPES OF RESISTANCE

     ENCOUNTERED IN OUR INDUSTRY

     

    LIFTING CAPABILITY - 79.2 to 26.5 Tons

    BOOM STAGE - 158,400 lbs. To 53,000 lbs.

    Angle - 70 Degrees

    BOOM HEIGHT - 53’ Max

    MAX. WEIGHT RECOVERY HEIGHT - 30’

    MIN. WEIGHT RECOVERY HEIGHT - 53’

    EQUIPMENT - Cat 374 Excavator

    # OF ROTATORS REQUIRED - (Stage #1 Boom 30’) Recovery Lift  1’ Distance or more Need 2-Rotators

     

    LIFTING CAPABILITY - 33.3 to 10.5 Tons

    BOOM STAGE - 66,600 lbs. To 21,000 lbs.

    Angle - 30 Degrees

    BOOM HEIGHT - 33’ Max

    MAX. WEIGHT RECOVERY HEIGHT - 19’

    MIN. WEIGHT RECOVERY HEIGHT - 33’

    EQUIPMENT - Cat 973K Track Loader

    # OF ROTATORS REQUIRED - (Stage #1 Boom 19’) Recovery Lift  10’ Distance or more Need 2-Rotators


     

    LIFTING CAPABILITY - 26.6 to 9.1 Tons

    BOOM STAGE - 53,200 lbs. To 18,200 lbs.

    Angle - 0 Degrees

    BOOM HEIGHT - 9’ Max

    MAX. WEIGHT RECOVERY HEIGHT - 9’

    MIN. WEIGHT RECOVERY HEIGHT - 9’

    EQUIPMENT - Volvo ABG PTR240 Asphalt Compactor

    # OF ROTATORS REQUIRED - (Stage #1 Boom 8’) Recovery Lift  13’ Distance or more Need 2-Rotators

    SIDE RECOVERY RESISTANCE WITH NRC INDUSTRIES

    SIDE RECOVERY RESISTANCE WITH NRC INDUSTRIES

     

    NRC 85-TON ROTATOR 

    NRC 40-TON CARRIER

    SIDE RECOVERY w/(2) 25,000 lbs. WINCHES PULLING CAPABILITIES LIMITATIONS

    One Line Recovery - 16,778.5 lbs.

    One Line with Snatch Block - 33,557.0 lbs.

    Two Line Recovery - 33,557.0 lbs.

    Two Line Recovery with Two Snatch Blocks - 67,114.0 lbs.

    PIPE LAYING PIT RECOVERY & HEAVY DUTY RECOVERY

    PIT EXCAVATION RECOVERY PROFESSIONAL

    BELOW WATER TABLE CONSTRUCTION RECOVERY PROFESSIONAL

    BELOW WATER TABLE CONSTRUCTION RECOVERY PROFESSIONAL

    PETERBILT 589 TWIN STEER TRI AXLE w/NRC 85 CRS 85-TON ROTATOR

    •  345” Wheelbase 
    • 20,000 lb Front Axle (Twin Steer 40,000 lbs.)
    • 52,000 lb Rear Axles 
    • 20,000 lb Pusher Axle 
    • 4.10 Gear Ratio  
    • Cummins X15 Engine – 605 HP • 2050 lb-ft Torque 
    • Eaton Fuller 18-Speed Manual Transmission
    • 2-Speed Aux. Transmission
    • 22.5” All Aluminum Wheels 
    • 18-Ply Michelin Tires
    • BodyMake: NRC 
    • Cab To Axle Length: 255" (21.25') 
    • Cab To End Of Frame Length: 320" (26.6') 
    • Gross Combined Weight: 86,000 lbs. 
    • NRC 85-Ton Rotator Wrecker Body 
    • Built for extreme recovery, heavy lifting, and maximum reliability in the field 


    JOB DISPATCH DESCRIPTION

    • EXCAVATION PIT - A excavator inside a pit that needs to be pick out of the pit


    STRENGTH ON JOBSITE:

    • Working Load Limitation in a Radius Lift Certifications and Safety Features on Lift Out of a Pit
    • Reduce the Long Reach Excavator Presence in a Tight job



    BELOW WATER TABLE CONSTRUCTION RECOVERY PROFESSIONAL

    BELOW WATER TABLE CONSTRUCTION RECOVERY PROFESSIONAL

    BELOW WATER TABLE CONSTRUCTION RECOVERY PROFESSIONAL

    PETERBILT 589 RI AXLE w/NRC 40TB INDUSTRIAL CARRIER 

    • 351” Wheelbase 
    • 20,000 lb Front Axle 
    • 52,000 lb Rear Axles 
    • 20,000 lb Pusher Axle 
    • 4.10 Gear Ratio  
    • Cummins X15 Engine – 605 HP • 2050 lb-ft Torque 
    • Eaton Fuller 18-Speed Manual Transmission
    • 2-Speed Aux. Transmission
    • 22.5” All Aluminum Wheels 
    • 18-Ply Michelin Tires
    • BodyMake: NRC 
    • Cab To Axle Length: 274" (22.83') 
    • Cab To End Of Carrier: 504" (42') 
    • Gross Combined Weight: 50,000 lbs. 
    • NRC 40-Ton Industrial Carrier Body 
    • (Four) 20-Ton Winches (In Front Behind Bumber, wo Side Pull Wiches and Winch on Carrier
    • Built for extreme recovery and maximum reliability in the field 


    JOB DISPATCH DESCRIPTION

    • BELOW WATER TABLE CONSTRUCTION - An Excavator is sub-merge is wetland


     WEAKNESS ON JOBSITE:

    • Cost Just to The Job Site
    • Downtime To Arrival
    • Working Area Need to Be Respected

    Reliable CONSTRUCTION Services

    Download Service List
    • BROKERING & DISPATCHING
    • WAREHOUSING & FORWARDING
    • CORPORATE TRAVELING
    • N.J.R. TRUCKING LLC
    • SUPERLOAD LOGISTICS
    • CATERPILLAR EXCAVATION
    • MAINTAINER FABRICATION
    • CONCRETE DIVISION
    • PIPE LAYING & RECOVERY
    • GRADING, PAVING & GROUNDS
    • MANITOWOC CRAWLER CRANE
    • LIEBHERR LTM MOBILE CRANE
    • LIEBHERR MK TOWER CRANE
    • ABOUT N.J.R. GROUP
    • TOWING AND RECOVERY

    NJR Trucking LLC

    1444 Jeffery Road #580

    2529033751

    Copyright © 2026 NJR Trucking LLC - All Rights Reserved.

    Powered by

    This website uses cookies.

    We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

    Accept