Naomi Jeanette Robinson Group

Naomi Jeanette Robinson GroupNaomi Jeanette Robinson GroupNaomi Jeanette Robinson GroupNaomi Jeanette Robinson Group
  • N.J.R. GROUP HOME PAGE
  • LOWE'S COMMERCIAL SALES
  • CATERPILLAR EXCAVATION
  • MAINTAINER FABRICATION
  • MANITOWOC CRAWLER CRANE
  • LIEBHERR LTM MOBILE CRANE
  • LIEBHERR MK TOWER CRANE
  • Towing & Recovery
  • Heavy Haul & Specialized
  • N.J.R. Trucking

Naomi Jeanette Robinson Group

Naomi Jeanette Robinson GroupNaomi Jeanette Robinson GroupNaomi Jeanette Robinson Group
  • N.J.R. GROUP HOME PAGE
  • LOWE'S COMMERCIAL SALES
  • CATERPILLAR EXCAVATION
  • MAINTAINER FABRICATION
  • MANITOWOC CRAWLER CRANE
  • LIEBHERR LTM MOBILE CRANE
  • LIEBHERR MK TOWER CRANE
  • Towing & Recovery
  • Heavy Haul & Specialized
  • N.J.R. Trucking

WELCOME TO N.J.R. GROUP FABRICATION AND INSTALLATION PAGE

RAM 5500 CREW CAB w/MAINTAINER SIGNATURE 1 SERIE & JEKKO JCX80 TELESCOPIC CRANE FABRICATION

 

The Robinson’s Estate Sub-Division

Custom Homes Building on Stilts Design

3047 Bass Landing Road

Edenton, NC 27932 

Property Length - 1,080’

Property Width - 1,120’

30.31 Acres Lot 

Cell: (252)903-3751 

tariq.robinson1969@gmail.com 

https://njrtruckingllc.com/pro-sales-specialist 


Dear Mr. & Mrs. Tariq Robinson

We estimate the house will be 450-Tons on weight. It will be best to have a center column as the main stilts that will be 15' Diameter This will be the center of the house structure. This will support the entire house. We can do the breakaway Walls as well as you plan. 


Also There will be Concrete Columns On Each Corner. 

A total of 80 Columns 18" Diameter (90,000 psi) for Floor Support 

One Columns that is 15' Diameter at Center of House (900,000 psi)


MAIN STILTS IN CENTER OF MAIN HOUSE 

(15'L x 15'W x 20'H)

  • # of Stilts (Including Center Stilts) - 97
  • # of Wooden Center Stilts Post Dimensions (12"x12x20') Driven in the Ground 15' - 113
  • # of Feet of Rebar Required for 15'x15'x20' center Stilt - 203'
  • Total Weight of Rebar Frame for Concrete Pump Pouring (lbs.) - 2,716
  • # of 2x4x16 Studs for Conrete Framing - 80
  • Weight of 2x4x12 Studs for Center Stilts (lbs.)1,600 lbs.
  • # of 3/4"x4'x8' Plywood for Center Stilts Concrete Forms (lbs.) - 2,400
  • TOTAL PICK WEIGHT (lbs.) - 6,716
  • Hook Block Weight (10-Tons w/2 Sheaves) (lbs.) - 678
  • To Assemble the Concrete Form and Place with Jekko JCX80 Telescopic Crawler Crane (lbs.) - 7,394 lbs. @ 11' Radius
  • To Assemble the Concrete Form and Place with Ram 5500 Larimie Crew Cab w/Maintainer Signature Series 1 / 14' Body w/12625 Crane (lbs.) - 7.695 lbs. @11' Radius 


 SUB-FLOOR STILTS IN MAIN HOUSE 

(1.5'L x 1.5'W x 20'H)

  • # of Stilts (Including Center Stilts) - 97
  • # of Wooden Center Stilts Post Dimensions (12"x12x20') Driven in the Ground 15' - 113
  • # of Feet of Rebar Required for 1.5'x1.5'x20' center Stilt - 120'
  • Total Weight of Rebar Frame for Concrete Pump Pouring (lbs.) - 83
  • Weight of (4) 1.5' x 1.5' x4' Concrete Tube (lbs.) - 215 lbs.
  • TOTAL PICK WEIGHT (lbs.) - 976
  • Hook Block Weight (10-Tons w/2 Sheaves) (lbs.) - 678
  • To Assemble the Concrete Form and Place with Jekko JCX80 Telescopic Crawler Crane (lbs.) - 7,394 lbs. @ 11' Radius
  • To Assemble the Concrete Form and Place with Ram 5500 Laramie Crew Cab w/Maintainer Signature Series 1 / 14' Body w/12625 Crane (lbs.) - 7.695 lbs. @11' Radius 

 House 150' x 100' x  48'

Total Stilts Excavation and Concrete Pump Prep - 12 per 45° of center House Stake


North Bearing (360°)

  • MAIN STILT - 0 to 8.5' 
  • Floor Support Stilt - 27.75' to 29.25'
  • Floor Support Stilt - 47.75' to 49.25'
  • Floor Support Stilt - 67.75' to 69.25'
  • Floor Support Stilt - 87.75' to 89.25'
  • Floor Support Stilt - 107.75' to 109.25'

North East  Bearing (45°)

  • MAIN STILT - 0 to 8.5' 
  • Floor Support Stilt - 27.75' to 29.25'
  • Floor Support Stilt - 47.75' to 49.25'
  • Floor Support Stilt - 67.75' to 69.25'
  • Floor Support Stilt - 87.75' to 89.25'

East Bearing (90°)

  • MAIN STILT - 0 to 8.5' 
  • Floor Support Stilt - 27.75' to 29.25'
  • Floor Support Stilt - 47.75' to 49.25'
  • Floor Support Stilt - 67.75' to 69.25'
  • Floor Support Stilt - 87.75' to 89.25'

South East Bearing (135°)

  • MAIN STILT - 0 to 8.5' 
  • Floor Support Stilt - 27.75' to 29.25'
  • Floor Support Stilt - 47.75' to 49.25'
  • Floor Support Stilt - 67.75' to 69.25'
  • Floor Support Stilt - 87.75' to 89.25'

South Bearing (180°)

  • MAIN STILT - 0 to 8.5' 
  • Floor Support Stilt - 27.75' to 29.25'
  • Floor Support Stilt - 47.75' to 49.25'
  • Floor Support Stilt - 67.75' to 69.25'
  • Floor Support Stilt - 87.75' to 89.25'

South West Bearing (225°)

  • MAIN STILT - 0 to 8.5' 
  • Floor Support Stilt - 27.75' to 29.25'
  • Floor Support Stilt - 47.75' to 49.25'
  • Floor Support Stilt - 67.75' to 69.25'
  • Floor Support Stilt - 87.75' to 89.25'

West Bearing (270°)

  • MAIN STILT - 0 to 8.5' 
  • Floor Support Stilt - 27.75' to 29.25'
  • Floor Support Stilt - 47.75' to 49.25'
  • Floor Support Stilt - 67.75' to 69.25'
  • Floor Support Stilt - 87.75' to 89.25'

North West Bearing (315°)

  • MAIN STILT - 0 to 8.5' 
  • Floor Support Stilt - 27.75' to 29.25'
  • Floor Support Stilt - 47.75' to 49.25'
  • Floor Support Stilt - 67.75' to 69.25'
  • Floor Support Stilt - 87.75' to 89.25'



Dependable Freight Transport

NAOMI JEANETTE ROBINSON LOGISTICS GROUP

1444 Jefferys Road #580

Rocky Mount, NC 27804

Office: (252)877-2108

Fax (252)877-2117

Cell (252)903-3751

Toll Free (844)415-3410

njrtruckingllc@gmail.com 

7

FABRICATION ADDRESS

Street - 2308 S. Wesleyan Blvd.

City, State & Zip Code - Rocky Mount, NC 27803


Learn More About Our Fleet Services

FABRICATION OF REBAR AND SETTING CONCRETE TUBES & FORMS

1st DAY IN CONCRETE STILT PREP

The 1st day as the Fabricator and Installer.


EQUIPMENT REQUIRED:

2026 Ram 5500 Crew Cab Laramie 4x4 Crew Cab with Custom Maintainer Signature 2 Series w/11' Mechanic Body All Aluminum with

  1. Globe Tag-a-Long 20-Ton Model#20TA129068 to transport Equipment and supplies to Jobsite
  2. Jekko JCX80 Telescopic Crawler Crane 
  3. Caterpillar 305 CR Mini Excavator with Pile Driving Attachment 


FIRST DAY PROVISIONS

  • Stop by Lowe's pro Desk to order 12"x12"x20' Timber 
  • Then go by Job site to drone the area with Motorized LCD Screen to see how to set 4"x4"x16' Post to Nail up a Shelf for string line for Pile Driving into the soil 15' Deep 
  • Check Blueprints to see height of Stilts
  • I will pick up (20) 4x4x16 Post from Lowe's to Pile Drive for 3 Plane Laser Level Line to get my columns or stilts within 1/16" of Center

2nd DAY IN CONCRETE STILT PREP

The 2nd day as the Fabricator and Installer.


EQUIPMENT REQUIRED:

2026 Ram 5500 Crew Cab Laramie 4x4 Crew Cab with Custom Maintainer Signature 2 Series w/11' Mechanic Body All Aluminum with

  1. Caterpillar 305 CR Mini Excavator with Pile Driving Attachment 
  2. Measuring Wheel the circumference of the the outside of the Stilts Prep Area (100' x 150') Putting a Paint Mark every 20' an "X" for 4x4 post to be pile driven into the ground 6' with 10' Expose
  3. Purchasing (4) Bosch 400' Green 360 Degrees Leveling 3 Plane Laser
  4. Placing a Plane Lase on Right side Front going to the rear of my location on the 4x4 Post for the Center Stilts 
  5. Placing a Line Level in the rear on my left side of center stilt for level grade shing Laser onto 4x4 post
  6. Placing a Plane Laser on my far right in front on me with line laser going to the left side on a 4x4 post
  7. Pacing a Plane Laser on my Left Rear of the Stilts going to the right to be shinning on 4x4 post
  8. Once all the Plane Laser are set. I will walk and mark the 15'x15' area for the main house stilts



3rd DAY IN CONCRETE STILT PREP

3rd DAY IN CONCRETE STILT PREP

The 3rd day as the Fabricator and Installer.


EQUIPMENT REQUIRED:

2026 Ram 5500 Crew Cab Laramie 4x4 Crew Cab with Custom Maintainer Signature 2 Series w/11' Mechanic Body All Aluminum with

  1. Caterpillar 305 CR Mini Excavator with Pile Driving Attachment 
  2. Will Pile Drive the 12"x 12" x 20' Post One at Top and Bottom and left and right within 15' and one dead center
  3. After Pile Driving i will compact the soil and leave the 12"x12 Post sticking out of the ground by 5' 
  4. Then i will Park the Cat 305 and set up the Jekko JCX 80 beside the Ram 5500 and i will Setting the Luffing Jib to be over the Center Main House Stilt
  5. I would of call Lowe's of Rocky Mount, NC to order more (48) 4x4x20 Post for setting the forms for pouring concrete
  6. I would also order (24) 23/32" x 4' x 8' Plywood  


4th DAY IN CONCRETE STILT PREP

4th DAY IN CONCRETE STILT PREP

3rd DAY IN CONCRETE STILT PREP

The 4th day as the Fabricator and Installer.


EQUIPMENT REQUIRED:

2026 Ram 5500 Crew Cab Laramie 4x4 Crew Cab with Custom Maintainer Signature 2 Series w/11' Mechanic Body All Aluminum with

  1. Caterpillar 305 CR Mini Excavator with Pile Driving Attachment 
  2. Genie S65 Telescopic Boom Lift
  3. I will tie a Sling unto a 4x4 Post and hold it strait up level by the Jekko Crane and i will then Use The Ram 5500 Crane to lift plywood and i will use the Jekko Crane and the Maintainer Crane on Ram 5500 to installed the 4x4 post in the middle of each plywood on the bottom of the form. The Post need to be 5' from the bottom edge of each plywood in the center. At the top i will need 7' from top of plywood to the top of 4x4 post.     
  4. Once i pile drive (8) 4x4 post with Plywood into the ground 5' I will ten place a 4x4 post on each corner of the plywood 6" from edge to secure the footing of the form to the ground as i build up
  5. I will then connect the 4x4 post to have 27' Tall 4x4 post out of the ground for a total of 24 Post at 27' Tall
  6. I would use the Jekko Crane to pick up Plywood and keep the remote around my neck and get on Genie with Metabo Cordless Finisher Nailer to nail the plywood to the 4x4 post. The Post on the outside



5th DAY IN CONCRETE STILT PREP

4th DAY IN CONCRETE STILT PREP

5th DAY IN CONCRETE STILT PREP

The 5th day as the Fabricator and Installer.


EQUIPMENT REQUIRED:

2026 Ram 5500 Crew Cab Laramie 4x4 Crew Cab with Custom Maintainer Signature 2 Series w/11' Mechanic Body All Aluminum with

  1. Lincoln Electric Flextrex 350X Construction - Welder Bay with Lines at Rear
  2. Lincoln Electric Flexcut 125 Plasma Cutter Bay
  3. Dewalt Cordless & Metabo Cordless Bay
  4. Topcon 2,000' Green Rotary Laser Surveying Bay w/Lidar Drone Survey 
  5. I will use the Jekko crane with a 4 chain sling to pick up 4 20' rebar vertical. I will take my plasma cutter to cut (8) 20' rebar into 15' pieces, I will connect the bottom 1' up to make a rectangle on the bottom
  6. I will get in the Genie to do the top at 3" Down 
  7. Once i tact weld the rebar to make it stand in place
  8. I will pick one rebar at a time and tack weld it 1' Space on one side only. Repeat step until one side has 15 Rebar vertical.



6th DAY IN CONCRETE STILT PREP

4th DAY IN CONCRETE STILT PREP

5th DAY IN CONCRETE STILT PREP

The 6th day as the Fabricator and Installer.


EQUIPMENT REQUIRED:

2026 Ram 5500 Crew Cab Laramie 4x4 Crew Cab with Custom Maintainer Signature 2 Series w/11' Mechanic Body All Aluminum with

  1. Lincoln Electric Flextrex 350X Construction - Welder Bay with Lines at Rear
  2. Lincoln Electric Flexcut 125 Plasma Cutter Bay
  3. Dewalt Cordless & Metabo Cordless Bay
  4. Topcon 2,000' Green Rotary Laser Surveying Bay w/Lidar Drone Survey 
  5. I will use the Jekko Crane to lift a Rebar Horizontally to connect the outside rebar at 12" from bottom by stick welding. I would continue the outside until i get to the top and start another column.
  6. I will repeat this process until i have finished



7th DAY IN CONCRETE STILT PREP

7th DAY IN CONCRETE STILT PREP

7th DAY IN CONCRETE STILT PREP

The 7th day as the Fabricator and Installer.


EQUIPMENT REQUIRED:

2026 Ram 5500 Crew Cab Laramie 4x4 Crew Cab with Custom Maintainer Signature 2 Series w/11' Mechanic Body All Aluminum with

  1. Lincoln Electric Flextrex 350X Construction - Welder Bay with Lines at Rear
  2. Lincoln Electric Flexcut 125 Plasma Cutter Bay
  3. Dewalt Cordless & Metabo Cordless Bay
  4. Topcon 2,000' Green Rotary Laser Surveying Bay w/Lidar Drone Survey 
  5. Pick up Rebar Frame and set it inside Plywood Forms
  6. After Setting the Rebar. I will allow the Concrete Pumper to come in to pour 1,500 Cubic Yards
  7. The 12"x12 Post is anchors in the ground to prevent from sinking. 



2026 Ram 5500 Crew Cab 4x4 Laramie Model w/Maintainer Custom

NJR Trucking - Reliable Freight

 

NAOMI JEANETTE ROBINSON LOGISTICS GROUP        

1444 Jeffreys Road

Rocky Mount, NC 27804

Toll Free Phone# (844)415-3410

Office# (252)877-2108

Cell# (252)903-3751

Fax# (252)877-2117

Toll Free# (844)415-3410

njrtruckingllc@gmail.com 

https://www.njrtruckingllc.com 




(N.J.R. Logistics Group Fabrication & Installation 



Equipment

2026 Ram 5500 Crew Cab 4x4 Laramie 203" Wheelbase, 84" Cab to Axle Frame

GVWR: 33,000 lbs.

Engine: Powerstke 6.7 Litre Diesel 

Torque: 1,250 lb-ft of Torque

Front Axle: 7,500 lbs.

Rear Axle: 10,000 lbs.

Body Length: 11'

Body Height: 56"

Body Width: 94”

Floor Width: 60”


2026 Maintainer Service Body Signature Series 1 Aluminum 11' Body Length

Body, crane tower, outriggers rated at 40,000 ft*lb. moment rating

Body Substructure: frame constructed of 10” formed aluminum main sills with crossmembers and structural tubing on 12” spacing

1/8" aluminum compartment construction

49" wide center deck width

56" tall x 23" deep compartments

164 cu. ft. of storage capacity

26" rear workbench bumper with lighted recessed step

Recessed fuel fills

Ribbed compartment floors

(6) flush mounted D-ring tie downs

10" slam-latch aluminum tailgate

3/16" single piece recessed aluminum doors

D-ring stainless steel compression door latches

Gas spring door holders

Aluminum drip rail above compartments

250 lb. capacity adjustable aluminum shelving

3-point center deck access with safety yellow handles

PPG etch-primed, urethane-primed and painted

Undercoating

Master lock system

97 db backup alarm

LED marker and tail lights

I.C.C. safety kit (2.5 lb. ABC fire extinguisher & hazard reflectors)

CAN Control System standard with 65620 cranes and larger

Patented Pressurized Storage System (PSS)

Rear strobe lights

DuaLock drawers and Bolt Bins

Vises and vise mounting plates

Interior LED strip lighting

Exterior LED flood lights

Miller diesel driven welders

Light bars

Safety strobe lighting

Slide top center deck covers

Protective spray covering packages

Hydraulic driven air compressors

Miller All-in-one APU units

Trusted Freight Brokerage

 

NAOMI JEANETTE ROBINSON LOGISTICS GROUP

1444 Jefferys Road #580

Rocky Mount, NC 27804

Office: (252)877-2108

Fax (252)877-2117

Cell (252)903-3751

Toll Free (844)415-3410

njrtruckingllc@gmail.com 


EQUIPMENT REQUIRED:

2026 Ram 5500 Crew Cab Laramie 4x4 Crew Cab with Custom Maintainer Signature 2 Series w/11' Mechanic Body All Aluminum with

  1. Lincoln Electric Flextrex 350X Construction - Welder Bay with Lines at Rear
  2. Lincoln Electric Flexcut 125 Plasma Cutter Bay
  3. Lincoln Electric 50kW Mobile DC Fast Charger w/(2) Aims Power Twin 5,000 watt Power Inverter
  4. Kobalt Quiet Tech 26- Gallon Portable 150 psi Vertical Air Compressor
  5. Dewalt Cordless & Metabo Cordless Bay
  6. Topcon 2,000' Green Rotary Laser Surveying Bay w/Lidar Drone Survey 
  7. 65" Weatherproof Motorized LCD Monitor at Rear of Cab 


Get Your Estimate Now
  • CATERPILLAR EXCAVATION
  • MAINTAINER FABRICATION
  • MANITOWOC CRAWLER CRANE
  • LIEBHERR LTM MOBILE CRANE
  • LIEBHERR MK TOWER CRANE
  • Towing & Recovery
  • Heavy Haul & Specialized
  • N.J.R. Trucking

NJR Trucking LLC

1444 Jeffery Road #580

2529033751

Copyright © 2026 NJR Trucking LLC - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept